Commercial electrical installations must be inspected regularly to meet legal responsibilities, insurance conditions and duty-of-care obligations to staff and the public.
An Electrical Installation Condition Report (EICR) provides a formal assessment of the safety and condition of your electrical system, identifying deterioration, defects or non-compliance that could present risk.
We carry out structured inspections across commercial, industrial and public sector premises throughout the Isle of Man, planning works carefully to minimise disruption to operations. Reports are clear, professional and suitable for auditors, insurers and regulatory bodies.
Access requirements and operational constraints are reviewed to arrange works with minimal disruption.
Installations are assessed systematically in accordance with recognised standards.
Findings are documented in a compliant EICR with clear safety classifications.
We explain the results and advise on any actions required to achieve compliance.
● Full Electrical InstallationCondition Report (EICR)
● Inspection of wiring systems,distribution boards and equipment
● Testing of circuits and protectivedevices
● Verification of earthing andbonding arrangements
● Identification of defects,deterioration or unsafe modifications
● Assessment against currentregulations
● Risk-graded observations usingstandard classification codes
● Formal documentation forcompliance records
● Recommendations for remedial workwhere required
● Guidance on future inspectionintervals
All inspections are carried outmethodically using calibrated test equipment to ensure reliable results.
While requirements vary by sector, regular inspection is widely expected to demonstrate compliance with health and safety legislation and insurance conditions. Many regulators, landlords and corporate policies also require formal certification.
Inspection intervals depend on the type of premises, usage and risk level. Typical guidance ranges from every 3 to 5 years for many commercial environments, though higher-risk sites may require more frequent testing. We can advise on appropriate intervals for your specific operation.
We plan inspections to minimise disruption wherever possible. In some cases, testing can be scheduled outside normal working hours or carried out in phases to keep critical systems operational. Any required shutdowns will be agreed in advance.
Not all findings require immediate action. You’ll receive a clear explanation of priorities and practical recommendations.
Yes. Our reports follow recognised formats and are suitable for compliance records, insurance providers, regulators and internal audits.
Yes. Most commercial EICRs are completed while premises remain operational. Access arrangements are coordinated in advance to ensure safety and efficiency.
We inspect a wide range of local sites including offices, retail, hospitality venues, healthcare settings, educational facilities, public buildings and more.
Duration depends on the size and complexity of the installation. Smaller premises may be completed within a day, while larger or multi-site operations require longer. A clear programme will be agreed beforehand so you know exactly what to expect.